Workshops transformed, hand in hand with their teams
Every project starts from a concrete situation on the shop floor. Here are three transformations carried out with our customers, and what they changed day-to-day.
Automotive · e-mobility+35%
line throughput
−30%
floor space used
−55%
work-in-progress between stations
An assembly line that finally keeps up with the pace
From an island-based workshop to a synchronized line, without production downtime.
Read the case study
Food industry · packaging+35%
peak capacity
5 min
to switch from one format to another
−40%
unnecessary movement
Absorbing seasonal peaks without improvising
A line-side replenishment redesigned to hold up under seasonal peaks.
Read the case study
Electrical engineering5 months
from study to production
−40%
cycle time
+3 shifts
activatable at constant floor space
Industrializing a new line twice as fast
A new line designed from the study phase to produce faster, sooner.
Read the case study
What if we took a look at your workshop?
The best starting point is still a field visit. Our design office offers you a free audit, with a response within 24 hours.